香蕉影视環保科技有限公司
|
Sequence of measure 計時流程 |
||||||||||
|
1 |
Turn off the feed pump with the machine running 關閉進料泵,設備繼續(xù)運行 |
|
|
|
|
|
|
|
||
|
2 |
Divert the discharge chutes 製(zhì)動泥水分離閥(fá)電機 |
|
|
|
|
|
|
|
|
|
|
3 |
Open the flush valves 開啟衝洗閥(fá)門 |
|
|
|
|
|
|
|
|
|
|
4 |
Turn off the main drive 停止主驅動電機 |
|
|
|
|
|
|
|
||
|
5 |
Close the flush valves 關(guān)閉衝洗(xǐ)水閥門 |
|
|
|
|
|
|
|
||
|
6 |
Open the discharge chutes 開啟卸料槽 |
|
|
|
|
|
|
|
||
|
10 20 30 40 50 60 70分/轉 |
||||||||||
Copyright © 2011-2025 wxlk888.com 香蕉影视環保(bǎo)科技有限公司(sī) 版權所有浙ICP備15011360號-1